How the deck is arranged
A raised rear deck and detachable front neck frame a low central well. Usable well length, loaded deck height and transition clearances are primary comparison points.
An RGN creates a low main well and a front loading path after the gooseneck is detached. It is a common starting point when a self-propelled machine must be driven onto the deck and loaded height matters.

A raised rear deck and detachable front neck frame a low central well. Usable well length, loaded deck height and transition clearances are primary comparison points.
The detached neck lets equipment approach from the front at a shallow angle. Confirm ground clearance, ramp angle, track contact and the procedure required to reconnect the neck under load.
Use this page to frame the first conversation. Manufacturer documentation, measured load data, securement planning and route review control the final selection.